Restauration Summary
What has been done
- "slipping" of the Eastern part stopped (2008f)
- roof structure repaired and the building re-roofed (2008f)
- damages that were caused by plants cleared
- all windows restored (2008f)
- door restaured (2008f)
- drainage connected (2014)
- new floor (2014)
- window in the West gable built (2015)
- electricity in the building (2015f)
- the ceiling cleaned, secured and restaurated (2016)
- The town Sinsheim has created a place of memorial for the victims of the Nazi regime (2018)
- securing and restauring the plastering in the upper regions of the interior walls (started in 2019)
- first layer of plastering in the lower regions of interior walls (2019)
Our next Plans
- dealing with the damages in the lower regions of interior walls (planned for 2018)
- repointing the outer walls
- conserving stones and bricks of the outer walls
In the Future
- We need an outbuilding
- for toilets
- to keep chairs, material for exhibitions etc
- for a scullery
What is missing
- the quotations show that we need at least 10.000€ in addition to the funds we already have acquired to finish the planned work concerning the synagogue
- For the necessary outbuilding we need additional funds